Saturday, August 9, 2014

Upstairs and Electrical work

With floor boards removed on the second floor, we sistered new joists next to old ones.  Then blocked inserts between the joists.

Blocked inserts below




With the floor boards still removed, we have roughed in electrical upstairs.  Ceiling lights for the first and second floors, and second floor outlets and lights switches.  Done.

And the first floor bathroom.