Saturday, December 13, 2014

Walls, Floors, and More

We continue to frame walls, lay floors, rough plumbing, duct work, and electrical.

Months ago, we framed out the doorway to the upstairs back space.


Which gave us access to the back unfinished area.


Sistered joists and blocked inserts.


The doorway was closed in beautifully with the wood cut from the wall.



And now, an antique heart pine floor is going down, and you can see the roughed in plumbing for the second floor bathroom.








No comments:

Post a Comment