Sunday, November 2, 2014

Electrical work continues . . .

Renovating an old house feels like a rollercoaster ride.  We chug along for months, suddenly we reach the crest, down we go, and the pace picks up.  Projects are ticked off quickly.  Then, we slow down, and catch our breaths.  Time to review, think, imagine, and plan.

Roughing electrical continues.  Plumbing next, but we still need to figure out the second floor bathroom. 

Light switches at the front door.


Light switches at the rear foyer door. This one is four switches.




 Top of the stairs outlet for a night light.  We don't want anyone falling down the steps.


Second floor bedroom.  Work continues . . . 


Hmmm . . . second floor bathroom. . . 