Sunday, November 23, 2014

Upstairs

We continue with the second floor.  With the front of the house complete, we move to the back unfinished space.  Joists are now sistered, and blocked inserts are done.


We will be finishing this area with a second floor bathroom and a third bedroom. Here's the plan (freely drawn!):


The upstairs front floor has been reinstalled. Yay!


And the second bedroom wall is up.


Can we look back?  Here are a few pictures of the second floor from our first visit to the house in spring 2011.



I'll leave you with a better image from last winter of John installing the restored second floor back window.